training-guides/doc/upstream-training/source/slides/_assets/workflow-project-status-and-zuul-jenkins-fail.png
Jay S. Bryant 82f8a33182 [upstream] Generalize Jenkins slides to Zuul
During review of the upstream training slides is was decided
that the existing detailed overview of Jenkins was not as
helpful.  We decided to generalize the topic a bit to talk
about Zuul and the different types of gates.

This patch removes the old content and renames the slides
accordingly.  The content now introduces status.openstack.org ,
explains Zuul and the different pipelines.  Talks about how to
find logs and investigate elastic-recheck failures.  As with
other updates things have are more exercise focused.

Change-Id: If527a57ee3874aa0168d08f093937970f90b1d10
2017-04-29 13:58:09 +00:00

57 KiB
487x591px